Drilling guides › Kick warning signs, flow checks and shut-in data

Kick warning signs, flow checks and shut-in data

By the DrillPro team · Last reviewed 9 November 2026

A kick is an unplanned flow of formation fluid (gas, oil or water) into the wellbore, caused when the pressure in the well falls below the pore pressure of a permeable formation. Caught early, a kick is a routine operation: shut in, read the pressures, circulate the influx out. Caught late, the influx is larger, the kill pressures are higher and the margin to the weakest formation shrinks. Kick detection is about keeping the influx small.

This guide explains the principles for training. On a real well, follow the rig's well control procedures, the bridging document and your company's well control policy. Where they differ from anything here, they take priority.

Why kicks happen

The mud column is the primary barrier. Anything that lowers the bottom-hole pressure, or anything that raises the formation pressure above what the plan expected, can let the well flow. The usual causes are:

Primary indicators: the well is flowing

Primary indicators mean formation fluid is entering the well now. Any one of them is a reason to stop and flow check, or to shut in directly if that is what the standing instructions say.

IndicatorWhat you seeNotes
Flow rate increaseReturn flow sensor (paddle or Coriolis) reads higher than the pump rate going inUsually the first sign at surface. Compare with the trend, not one reading.
Pit gainActive system volume rises with no transfer or mud additionEvery transfer, dump or chemical addition must be called to the driller, or real gains are lost in the noise.
Flow with pumps offThe well keeps flowing after the pumps are stoppedAllow for normal drain-back from the flowline and surface lines, which is why knowing your rig's drain-back volume matters.
Wrong trip tank volumeHole takes less than calculated fill when pulling, or gives back more than displacement when running inCompare against the trip sheet stand by stand.

Secondary indicators: warning, not proof

Secondary indicators mean the conditions for a kick may be developing. They are not proof of influx on their own, but they should prompt a flow check or at least closer watching.

The flow check

A flow check answers one question: is the well flowing with the pumps off? A typical sequence while drilling is: stop rotating, pick up to the shut-in position so that no tool joint is across the rams you would close, stop the pumps, and watch the flowline and the trip tank for the time set by your policy. In oil-based mud, gas can stay dissolved until it is near surface, so policies often call for longer checks and more caution with small gains.

Common mistakes are watching the wrong tank, not lining up the trip tank so that small flows are visible, and confusing drain-back with flow. If in doubt, the safe choice is to shut the well in and read the pressures. A shut-in well with no influx costs a little time; an open well with an influx can cost far more.

Shut-in methods

There are two general methods. In a hard shut-in, the choke is already closed and the BOP (annular or pipe ram) is closed directly, stopping the flow as fast as possible. In a soft shut-in, the choke line is open to the choke, the BOP is closed, and then the choke is closed. The hard method lets in the least extra influx; the soft method was historically used to reduce the pressure surge on the formation. Many operators now prefer the hard method, but the method used on your rig is set by the company policy and the rig's procedures, and the choke manifold line-up must match it.

Recording SIDPP, SICP and pit gain

Once the well is shut in, record the pit gain, the shut-in drill pipe pressure (SIDPP) and the shut-in casing pressure (SICP), with the time of each reading. Pressures normally build and then level off as the formation around the well recovers; the stabilised values are used for the kill. If they keep climbing slowly after stabilising, gas migration may be the cause, and the procedures for managing migration apply. With a non-ported float in the string, the SIDPP will read zero or too low until the float is opened by carefully bumping it with the pump.

SIDPP is the more useful number for formation pressure because the drill pipe is full of mud of known weight. The annulus contains the influx, so SICP is normally higher than SIDPP when the influx is lighter than the mud.

Formation pressure (psi) = SIDPP + 0.052 × MW (ppg) × TVD (ft) Pit gain (bbl) = level rise (in) × barrels per inch of active pits

In metric units, formation pressure (bar) = SIDPP (bar) + 0.0981 × MW (sg) × TVD (m), and pit gain in m³ is the level rise in metres times the pit area in m². One barrel is 0.159 m³.

Worked example 1: pit gain from level change

The active system is two connected pits, each 30 ft long and 8 ft wide. After the well is shut in, the level in both has risen 2.5 in above the reference.

Per pit = 30 × 8 ÷ 67.38 = 3.56 bbl/in Active system = 2 × 3.56 = 7.12 bbl/in Pit gain = 7.12 × 2.5 ≈ 17.8 bbl

A 2.5 in change is easy to miss on a single gauge, which is why gain alarms are set on the total active volume, and why the barrels per inch of the active system should be written on the driller's board.

Estimating the influx type

If you know the influx volume and the annular capacity where it sits, you can estimate the height of the influx and, from the difference between SICP and SIDPP, its density gradient. It assumes the influx is a single slug around the bottom of the BHA, the hole is in gauge, and the pressures are stabilised. Real influxes are spread out and mixed with mud, so treat the result as an indication, never as proof.

Influx height (ft) = pit gain (bbl) ÷ annular capacity (bbl/ft) Influx gradient (psi/ft) = mud gradient − (SICP − SIDPP) ÷ influx height Mud gradient (psi/ft) = 0.052 × MW (ppg)

As a rough guide, a gradient below about 0.25 psi/ft suggests mostly gas, around 0.3 to 0.4 psi/ft oil or a gas and liquid mix, and above about 0.4 psi/ft mainly water. The bands overlap, and a large error in the hole size gives a large error in the answer.

Worked example 2: influx gradient and formation pressure

8.5 in hole, 6.5 in drill collars 600 ft long, mud 11.0 ppg, bit at 10,000 ft TVD. Shut-in data: pit gain 10 bbl, SIDPP 350 psi, SICP 520 psi.

Annular capacity = (8.5² − 6.5²) ÷ 1029.4 = 0.02914 bbl/ft Influx height = 10 ÷ 0.02914 ≈ 343 ft (within the 600 ft of collars) Mud gradient = 0.052 × 11.0 = 0.572 psi/ft Influx gradient = 0.572 − (520 − 350) ÷ 343 = 0.572 − 0.496 ≈ 0.08 psi/ft Formation press. = 350 + 0.052 × 11.0 × 10,000 = 6,070 psi

A gradient around 0.08 psi/ft points to gas. That means the influx will expand as it is circulated up, the casing pressure will rise during the kill, and migration is possible if the well stays shut in. The kill mud weight from these numbers is about 11.7 ppg; see the kill sheet guide for the full calculation.

Why early detection matters

A smaller influx gives a lower SICP at shut-in and a lower peak casing pressure when gas reaches the shoe and the surface. That keeps the shoe pressure further below the fracture pressure measured by the leak-off test, and reduces the risk of an underground blowout. It also keeps the kill simple. In practice, the difference between a 5 bbl and a 25 bbl gas kick can be the difference between a quiet circulation and a kill where the MAASP is approached.

Good practice

Fill a kill sheet in DrillPro

DrillPro does these sums for you on Android, the web and desktop, and exports the result to PDF or Excel.